Side view of a rebuilt covered second-story deck with a stair to the yard in Downingtown, PA

Decks and Outdoor Structures

Deck repair and replacement in Lancaster and Chester County, PA

We take deck repairs, not only new builds: soft boards replaced, a loose railing rebuilt, stairs that have sagged reset on footings, a frame redecked in composite. When the deck was never built right, with a nailed ledger, posts in the dirt, or joists gone soft, we will tell you, and then we tear it out, haul it away, and build the new one on footings below the frost line with a ledger flashed and bolted through, to the current code.

Or call or text (484) 643-2600

Repair or Replace

We look at four things: the ledger and how it is attached, the posts and footings, the joists and beams, and the railing. Rotten boards on a sound frame can be redecked, a railing can be replaced on its own, and a stair can be rebuilt. A frame with a nailed ledger, posts in the ground, or joists that have gone soft is not worth building on, and a new frame is the right call. We let you know which you have on the first visit, and we are glad to do the repair when that is all it needs.

What Replacement Involves

  • The old deck demolished and hauled away, and the house wall inspected where the ledger was.
  • New footings dug below the frost line, inspected before the piers are poured.
  • A pressure-treated frame with the ledger bolted through to the house framing and flashed.
  • Composite decking with hidden fasteners, railing to the current height and baluster spacing, and stairs with closed risers and a landing.
  • Any rot or damage behind the old ledger repaired before the new one goes on, which is more common than you would think.

A Chance to Do It Right

A replacement is the time to fix what was wrong with the old deck: the stairs in the wrong place, no landing, a railing that blocked the view, a deck too narrow for a table. The Downingtown covered deck below replaced an unsafe deck with a new deck, a roof over it, a wide stair, and a railing you can see over.

Permits

A replacement deck is a new deck to the township: a building permit, footing and framing inspections, and a final. We walk you through it, every step.

Questions

Questions We Get

Can you redeck an old frame with composite?

If the frame is sound and the joists are at the spacing the composite needs, yes. Many old frames are at 24 inches, and composite needs 16 or 12, so sistering joists is often part of a redeck. We check before quoting.

What is wrong with a nailed ledger?

Nails pull out over time as the deck moves, and the ledger is what holds the deck to the house. Decks that collapse usually fail there. Ours are bolted through and flashed, and the inspector sees it.

Do you haul the old deck away?

Yes. Demolition and disposal are part of every replacement, and we leave the yard clean.

Do you do small deck repairs?

Yes. Boards, railings, stairs, and a frame that needs sistering are all jobs we take, and a railing-only job is welcome.

Process

How We Work

  • We visit, measure, and talk through the scope before anything is priced.
  • You get a written proposal, and we build to it.
  • Where the work needs a permit, we walk you through it every step: the application, the drawings the township asks for, and the inspections.
  • We are on site from the first day to the last, and the house stays clean while we work.
  • We walk the finished job with you, fix anything on the list, and clean up.

Decks and Outdoor Structures

More Kinds of Decks and Outdoor

Composite DecksWolf Perspective, Trex, Fiberon, or TimberTech, from a Wolf Certified Installer, with picture-frame borders and hidden fasteners.Covered Decks, Roofs, and Screened PorchesA roof over the deck, tied into the house, with a beadboard ceiling and a fan, so the deck is used in the rain and in August.Front Porches, Porticos, and Door CanopiesA porch roof across the front, a gabled portico over the door, or a pent roof over the garage, to give a flat house some depth.Pergolas, Pavilions, and Privacy WallsShade and a room outdoors: a pergola over the patio, a pavilion with a real roof, a slat wall for privacy, a hot tub built in.Outdoor Kitchens, Patios, and FireplacesA grill built into stone, a bar under the deck, a fireplace at the end of the patio, and the patio to tie it together.Outdoor ShowersA real outdoor shower against the house, sided to match, with a louvered roof, a bench, and hot water.PVC DeckingAn all-plastic board with no wood fiber in it: Wolf Serenity and Wolf Haven, lighter, cooler, and the longest-lived deck we build.Wood DecksPressure-treated, cedar, or Ipe, for the people who want the real thing and will give it a coat of oil now and then.Deck RailingWolf, aluminum, cable, composite, or wood railing on a new deck or your existing one. Railing-only jobs are welcome.Under-Deck Drainage and CeilingsA drainage system between the joists and a finished ceiling below, so the space under a second-story deck becomes a dry room.All decks and outdoor structuresThe service page, with the full scope and every project.

Service area

Where We Work

Based in Christiana, we work across Lancaster County and Chester County.

Lancaster County

  • Christiana
  • Gap
  • Quarryville
  • Strasburg
  • Lancaster

Chester County

  • Parkesburg
  • Coatesville
  • West Chester
  • Kennett Square
  • Downingtown
  • Malvern
  • Chester Springs
  • Frazer

We recently had Kings Remodeling complete a front portico, a garage apron, and patio door covering on our home, and are very pleased with the quality of the work. The team was professional, communicated well throughout the project, and was responsive to our questions. They also followed up after the work was completed to make sure everything was done to our satisfaction. Overall, a great experience and we would definitely recommend Kings Remodeling.

— Jennifer HaynFront portico, garage canopy, and patio door cover5 stars on Google

Ready to Replace the Deck?

Every great project starts with your vision for your home. Tell us what you’re thinking. We’ll get back to you within 48 hours.